wankang2050@gmail.com
Home · Factory & quality

Factory & quality

Twenty-six people, one building, no subcontracted frames. Our kilns, our joinery and our finishing room, which is why a change to a leg profile is a conversation rather than a quotation.

Production floor

How an order runs

Made to order in solid timber. Every piece here can change dimension, timber and finish — that is a conversation with our joinery, not a re-tooling fee.

Process

01

Kiln drying

Timber arrives green and leaves our kilns at 8–12 % moisture, measured board by board.

02

Machine cut

CNC and spindle moulder cut the joinery; profiles are checked against the first-off sample.

03

Hand fitting

Every joint is dry-fitted by hand before glue-up — this is where a bought-in frame gives itself away.

04

Finishing room

Dust-controlled room for oil, lye and lacquer, with a 24-hour cure before packing.

Testing before it ships

Every joint is dry-fitted by hand before glue-up — this is where a bought-in frame gives itself away.

FSC 100 %CARB P2EN 12520EN 12521EN 581 outdoorBSCI audited
Testing